📱服务热线:010-83634211

xiangqing
xiangqing
Update on Deforestation Risk Map Development for Verra’s New REDD Methodology
- 分类:新闻资讯
- 发布时间:2025-04-09 14:20
【概要描述】近日,碳市场标准制定权威Verra公布了其首批去森林化风险地图(Deforestation Risk Maps),该成果是Verra正在开发的新一代REDD方法学中的核心组成部分。这一动作不仅标志着REDD项目基线设定方式的革新,也彰显了遥感技术在碳资产生成过程中的战略价值。
Update on Deforestation Risk Map Development for Verra’s New REDD Methodology
【概要描述】近日,碳市场标准制定权威Verra公布了其首批去森林化风险地图(Deforestation Risk Maps),该成果是Verra正在开发的新一代REDD方法学中的核心组成部分。这一动作不仅标志着REDD项目基线设定方式的革新,也彰显了遥感技术在碳资产生成过程中的战略价值。
- 分类:新闻资讯
- 作者:
- 来源:Verra
- 发布时间:2025-04-09 14:20
- 访问量:
Verra is announcing several updates related to allocated deforestation risk maps for use under Verified Carbon Standard (VCS) methodology VM0048 Reducing Emissions from Deforestation and Forest Degradation, v1.0 and the associated module VMD0055 Estimation of Emission Reductions from Avoiding Unplanned Deforestation, v1.1.
Projects seeking to use VM0048 and VMD0055 are required to use these risk maps to set the baseline for their projects, an essential step in the project registration process.
Updates on Estimated Availability Dates
Verra has updated the Allocated Deforestation Risk Maps: Timetable webpage to reflect the expected publication dates for the following:
Provisional allocated deforestation risk maps for each jurisdiction (open-access data)
Final allocated deforestation risk maps and VMD0055-compliant project baseline activity data (VMD0055-compliant data)
Adjustments to the originally posted publication dates were necessary to enable the development of robust data that results in the certification of high-integrity projects. The reasons for the changes include corrections to ensure data reliability, and an improved understanding of the time required to finalize high-quality allocated deforestation risk maps. VM0048 includes a transformational and new approach to forest conservation which requires occasional timeline adjustments during the implementation.
Verra will regularly update the Allocated Deforestation Risk Maps: Timetable page to reflect the most recent development status of data for the individual jurisdictions. In addition, Verra will publish quarterly updates on the availability of open-access data and VMD0055-compliant data.
Improved Information about Use of Data
The Availability of Allocated Deforestation Risk Maps webpage has been expanded and updated to provide more detailed information about the use of provisional allocated deforestation risk maps (open-access data) as well as the final allocated deforestation risk maps and VMD0055-compliant project baseline activity data (VMD0055-compliant data).
A Look Ahead
Verra will soon publish a survey seeking input from relevant stakeholders to inform the order in which Verra will develop risk maps for those jurisdictions currently listed as “prioritization pending” on the Allocated Deforestation Risk Maps: Timetable page. The survey results will also guide the second round of data collection that will be needed soon for many jurisdictions.
扫二维码用手机看
中世成碳科技有限公司是一家专注于低碳领域发展的创新型企业。
公司拥有一支长期从事应对气候变化、碳市场服务、能源与金融、生态与林业等领域的创新服务团队,公司提供碳资产管理团队组建、碳金融产品开发、碳资产开发及交易、温室气体排放清单编制等一系列全方位、专业化的低碳产业链服务,我们秉承服务第一、客户第一的企业宗旨,不断努力与进取,竭诚为广大用户提供高效、周到、满意的服务。
© 2020 CEDESIGNcedemo.cn ALL RightsReserved 京ICP备17053437号-1 网站建设:新网